Permit No._______________

Copy sent to applicant______                                           

 

 

                                                

 

 

 

 

 

 

BUILDING PERMIT APPLICATION

 

 

 

 

CITY OF WILLIAMSBURG

 

 

WILLIAMSBURG, IOWA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                                                                                                                                  

 

 

 

CITY OF WILLIAMSBURG

BUILDING PERMIT APPLICATION

         

 

DATE_____________

 

Owner_______________________        Applicant____________________

 

Address______________________ Address_____________________

___________________________     __________________________

Telephone___________________     Telephone__________________

Legal Description        Lot______        Block_______  Addition_____________

________________________________________________________

________________________________________________________

________________________________________________________

Street address_____________________         Zoned_____________

Is this in flood plain?   Yes____        No____

Lot Dimensions        Depth_____        Width_____    Square feet______

Setback required        Front_____                Side______     Rear_______

 (See page 4)

Setback furnished  Front____          Side______     Rear_______

Variance needed              Yes____        No____        Dated Granted_______

        Condition____________________________________________

________________________________________________________

Number of Buildings Now on Lot(s)_______Number proposed______

Class of Work        New__        Addition__        Move-in___        Alteration__

                        Demolition____

        Use of existing structure        None___        Commercial____             

                Residential_____   Other_____________________

        Proposed use of new structure______________________

        Construction cost (if commercial)____________________

New building Dimensions:Length_____ Width____ Square feet_____

Sewage disposal:        Public (City)_____   Individual (Septic)______

Water supply:      Public (City)_____   Individual (Well)_______

__________________________________________________

 

Contractor___________________ Address____________________

Lot plan submitted: Yes____ No____ Completion date:_________

Permit fees:  Residential        New Residence---------------$100.00

                        Alteration or Addition---------------------$  50.00

                        Storage Building (Maximum 150 sq.ft)  $  25.00

                   Commercial 0.1% of Construction Cost      

                                                    Minimum                  $100.00

 

 

 

WATER HOOK-UP SCHEDULE (Meter Only in Newer Subdivision)

 

WATER HOOK-UP FEES:

 

New Home Service 1” Service Line            11/2” Service Line            2” Service Line

1” Tap--- $275.00            Tap---$275.00                       Tap---$400.00                       Tap---$515.00

Meter---- $  80.00   Meter-$145.00                       Meter-$355.00                       Meter-$475.00

Total----- $355.00            Total--$420.00            Total--$755.00            Total--$990.00

 

Lots in new subdivisions are charged only for meter if subdivider provided service line to lot.

 

Sewer hook-up schedule (No charge in newer subdivision with services extended to lot)

 

Sewer hook-up fee (Saddle supplied by City) - $100.00

 

NOTE:            A saddle provided by the City shall be installed by your

                        contractor on the sewer main.  Installation must be inspected

                        by City personnel prior to burial.

 

_______________________________________________________________________

 

 

I hereby certify that I have read and examined this application and know the same to be true and correct.  All provisions of any other state or local law regulating construction or the performance of construction.  It is expressly understood that the Zoning Regulations of the City are to be followed.

 

 

Signature of Applicant_______________________________            Date___________

 

Approved by    Inspector_____________________________              Date___________

 

                         Council Member_______________________            Date___________

 

Footing Tile Statement

All footing tiles must be inspected by City personnel prior to backfilling foundations.  Footing tiles shall be drained to sump pit or yard area.  Sump pumps must discharge to yard, street, or storm sewer.

 

Inspected by______________________________________            Date___________

 

ZONING

FRONT YARD

REAR YARD

SIDE YARD

AG

50

50

15

RS8

25

30**

7

RS40

50

50

20

C-1

35

15

10


 

*   If lot is adjacent to differently zoned district, check zoning ordinance

** Storage buildings and unattached garages need to be at least 5 feet from    the house and at least 5 feet from the rear yard (unless there is an alley)