Permit No._______________
Copy sent to
applicant______
BUILDING PERMIT APPLICATION
CITY OF WILLIAMSBURG
WILLIAMSBURG, IOWA
CITY OF WILLIAMSBURG
BUILDING PERMIT APPLICATION
DATE_____________
Owner_______________________ Applicant____________________
Address______________________
Address_____________________
___________________________ __________________________
Telephone___________________ Telephone__________________
Legal
Description Lot______ Block_______ Addition_____________
________________________________________________________
________________________________________________________
________________________________________________________
Street
address_____________________ Zoned_____________
Is this in
flood plain? Yes____ No____
Lot
Dimensions Depth_____ Width_____ Square feet______
Setback
required Front_____ Side______ Rear_______
(See page 4)
Setback
furnished Front____ Side______ Rear_______
Variance
needed Yes____ No____ Dated Granted_______
Condition____________________________________________
________________________________________________________
Number of
Buildings Now on Lot(s)_______Number proposed______
Class of
Work New__ Addition__ Move-in___ Alteration__
Demolition____
Use of existing structure None___ Commercial____
Residential_____ Other_____________________
Proposed use of new
structure______________________
Construction cost (if commercial)____________________
New
building Dimensions:Length_____ Width____ Square feet_____
Sewage
disposal: Public (City)_____ Individual (Septic)______
Water
supply: Public (City)_____ Individual (Well)_______
__________________________________________________
Contractor___________________
Address____________________
Lot plan
submitted: Yes____ No____ Completion date:_________
Permit
fees: Residential New Residence---------------$100.00
Alteration
or Addition---------------------$ 50.00
Storage Building (Maximum 150
sq.ft) $ 25.00
Commercial 0.1% of Construction Cost
Minimum $100.00
WATER HOOK-UP SCHEDULE (Meter Only in Newer Subdivision)
WATER HOOK-UP FEES:
New Home Service 1” Service Line 11/2”
Service Line 2” Service Line
1” Tap--- $275.00 Tap---$275.00 Tap---$400.00 Tap---$515.00
Meter---- $ 80.00 Meter-$145.00 Meter-$355.00 Meter-$475.00
Total----- $355.00 Total--$420.00 Total--$755.00 Total--$990.00
Lots in new subdivisions are
charged only for meter if subdivider provided service line to lot.
Sewer hook-up schedule (No charge in newer subdivision with services
extended to lot)
Sewer hook-up fee (Saddle supplied by City) -
$100.00
NOTE: A saddle provided
by the City shall be installed by your
contractor on the sewer main. Installation must be inspected
by City personnel prior to burial.
_______________________________________________________________________
I hereby certify that I have read and examined this application and know
the same to be true and correct. All
provisions of any other state or local law regulating construction or the
performance of construction. It is
expressly understood that the Zoning Regulations of the City are to be
followed.
Signature of Applicant_______________________________ Date___________
Approved by
Inspector_____________________________
Date___________
Council Member_______________________ Date___________
Footing Tile Statement
All footing tiles must be inspected by City personnel prior to
backfilling foundations. Footing tiles
shall be drained to sump pit or yard area.
Sump pumps must discharge to yard, street, or storm sewer.
Inspected by______________________________________ Date___________
ZONING
|
FRONT YARD
|
REAR YARD
|
SIDE YARD
|
AG
|
50
|
50
|
15
|
RS8
|
25
|
30**
|
7
|
RS40
|
50
|
50
|
20
|
C-1
|
35
|
15
|
10
|
* If lot is adjacent to
differently zoned district, check zoning ordinance
** Storage buildings and unattached garages need to be at least 5 feet from the house and at least 5 feet from the rear yard (unless there is an alley)